[00:00:01]

WE'RE MEETING TO ORDER ON

[Dallas TOD TIF District Board Meeting on January 28, 2025.]

JANUARY 28TH, 2025 AT 2:03 PM AND I'LL TURN THE MEETING OVER TO OUR, UM, ACTING CHAIR, UM, LUIS TE MAYO.

GOOD AFTERNOON EVERYONE.

WE HAVE A FORUM, SO LET'S GET STARTED WITH AGENDA ITEM ONE.

UM, BEFORE WE DO REMIND EVERYONE JOINING REMOTELY, UH, THAT WE ARE REQUIRED BY THE LAW THAT YOU HAVE YOUR CAMERAS ON, AND YOUR FACE IS ON CAMERA FOR THE ENTIRE MEETING.

AND PLEASE MAKE SURE YOU'RE ON MUTE, OF COURSE, UNLESS YOU'RE SPEAKING.

UM, WITH THAT, I'D LIKE TO CALL THE TRANSIT ORIENTED TIFF DISTRICT BOARD DIRECTORS MEETING TO ORDER ON TODAY, TUESDAY, JANUARY 28TH.

AND, UH, TIME IS 2 0 4.

UM, ITEM NUMBER ONE, UH, WE CALL IT ORDER ITEM NUMBER TWO.

UH, IT IS THE INTRODUCTION OF PARTICIPANTS.

UH, WE START KEVIN, RACHEL, PUBLIC COMMENTS, UH, OTHER PARTICIPANTS.

WE, UM, I THINK TYPICALLY WE WAIT FOR THE PRESENTATIONS AND I DO PUBLIC COMMENTS.

THAT'S KIND OF THE CHAIR.

WE, I SEE THAT WE HAVE PUBLIC COMMENTS THERE.

IT MAY HAVE TO BE ABLE HAVE A PRESENTATION.

WE CAN COMMENT ON SOMETHING.

THAT'S OKAY.

YEAH, IT'S REALLY UP TO THE CHAIR.

AND WE TYPICALLY LIKE TO DO THE PRESENTATION, BUT IN THE PUBLIC COMMENTS, I THINK WHAT WE'LL DO IS AFTER THE PRESENTATION SO WE CAN REACT TO SOMETHING.

UM, OTHER MEMBERS.

I, I GUESS EVERYONE ELSE IS ONLINE.

YES, SUE? YEAH, EVERYONE ELSE IS ONLINE.

WE DO HAVE SOME STAFF.

UH, WE ALSO HAVE, UH, THE CITY ATTORNEY'S OFFICE ONLINE IF THERE'S ANY QUESTIONS THAT COME UP ABOUT, AND WE HAVE, UM, STEFAN, THE PARK DEPARTMENT, AS WELL AS JUST STAFF FROM OUR OFFICE.

OKAY, FANTASTIC.

UM, WITH OUR OTHER MEMBERS INTRODUCE THEMSELVES THAT ARE ONLINE.

HI.

GOOD AFTERNOON.

THIS IS TRAVIS GASPER.

TRAVIS.

GOOD AFTERNOON.

AUSTIN GREEN IS ON AS WELL.

SO I SEE WE HAVE, UH, TODD EDGE, JONATHAN BRADDOCK, CRYSTAL GONZALEZ, ALLISON GRIFFIN.

I THINK THAT'S ALL THE MEMBERS ONLINE.

THANK YOU.

NEXT TIME IS REVIEW AND CONSIDERATION, A MOVING RECORD OF THE DECEMBER, DECEMBER 3RD, 2024 TOD TWO BOARD DISTRICT MEETING, UM, THAT A STAFF RECOMMENDATION OF APPROVAL.

IF EVERYONE HAS HAD A CHANCE TO REVIEW THE MINUTES, I WILL TAKE A MOTION, A MOTION, THE MINUTES BE APPROVED AS STATED.

I SECOND THAT MOTION HEARINGS.

UM, MOTION AND A SECOND.

UH, WILL ALL, ALL THOSE IN FAVOR SAY RAISE THEIR HAND AND SAY, AYE? AYE.

AYE.

ANYONE OPPOSED? MOTION CARRIES UNANIMOUSLY.

UM, ITEM FOUR IN IS REVIEW AND CONSIDERATION OF ONE REQUEST BY THE CITY DEPARTMENT AND RECREATION DEPARTMENT FOR AN AMOUNT NOT TO EXCEED $300,000 IN TOD TIF DISTRICT FUNDING FOR DESIGN, CONSULT, UH, CONSULT CONSULTANT SERVICES, INCLUDING BUT NOT LIMITED TO CONCEPTUAL SITE PLAN DEVELOPMENT AND PLANNING FOR FUTURE PHASE TWO IMPROVEMENTS WITHIN RONALD G PARISH PARK ADDRESSED AT 3,800 EAST EAST BOULEVARD.

AND TWO, A FINDING THAT DEDICATING AN AMOUNT NOT TO EXCEED $300,000 IN TIF IN TOD TIFF DISTRICT FUNDING TO RONALD G PARISH PARK, A PLACE OF PUBLIC ASSEMBLY THAT HAD LOCATED APPROXIMATELY 800 FEET, 0.15 MILES OUTSIDE OF THE CEDAR CREST SUBDISTRICT OF THE TOD TIFF DISTRICT, BUT WILL SERVE THE CEDAR CREST SUBDISTRICT OF THE T-O-D-T-O-D TIFF DISTRICT IS A BENEFIT TO THE CEDAR PRESS SUBDISTRICT OF THE TOD TIFF DISTRICT AND IS NECESSARY AND CONVENIENT TO THE IMPLEMENTATION OF THE TOD TIF DISTRICT PROJECT PLAN AND REINVESTMENT ZONE FINANCE AND PLAN.

AND WE HAVE PRESENTER, ANGELA, UH, THE DISTRICT PLAN OF THE ECONOMIC DEVELOPMENT, AND WE GO, HOPEFULLY EVERYONE CAN SEE THE PRESENTATION ON THE SCREEN.

YEP.

GOOD AFTERNOON, EVERYONE.

UH, JUST ONE LITTLE POINT OF CLARIFICATION.

RO G HARRIS.

NOT WRONG.

THAT'S OKAY.

ROLL IN G.

SORRY.

AND I WILL UNDERSCORE THAT THIS IS, UH, FOR PHASE TWO, THE CONCEPTUAL SITE PLAN DEVELOPMENT AND PLANNING, UH, FOR PARISH PARK, UM,

[00:05:01]

WHICH WAS, UH, ONIC.

NEXT SLIDE, PLEASE.

OKAY.

SO WE'RE TALKING ABOUT THE FORMER CADILLAC HEIGHTS PARK NEIGHBORHOOD.

UH, MUCH DISCUSSED, UM, ABOUT THIS, UH, NEIGHBORHOOD.

UH, IT'S A NEW PARK, UH, ADDRESSED AT 3,800 EAST KEYS BOULEVARD, UM, APPROXIMATELY 25 ACRES OF LAND, AND, UM, ABOUT 800 FEET AS INDICATED EARLIER, OUTSIDE THE CEDAR CREST SUBDISTRICT OF THE TLD TIFF DISTRICT.

UM, A PART OF THE HISTORY OF THE PARK IN HAS BEEN NO, UH, SECRET THAT THERE HAD BEEN A LACK OF FLOOD PROTECTION, A LACK OF ENVIRONMENTAL PROTECTION, AND A LACK OF INVESTMENT.

AND WE'RE HAPPY TO START CORRECTING THAT AND BRING RENEWAL TO THIS PARK.

UM, JUST BRIEFLY, UM, BETWEEN OH 2003 AND, UH, 2006, THERE WAS GENERAL OBLIGATION OF BOND FUNDING TO ACQUIRE THE LAND.

AT THE TIME, THERE WAS DISCUSSIONS ABOUT IF IT WOULD BE SUITABLE FOR, UH, A FUTURE POLICE ACADEMY OR RELATED FACILITIES, AND LATER DETERMINED THAT IT WAS NOT SUITABLE FOR THAT, BUT POTENTIALLY SUITABLE FOR A FUTURE PARK.

THE, UH, PARK AND RECREATION DEPARTMENT ENGAGED BETWEEN 2021 AND 2023 IN THE PROFESSIONAL SERVICES AND DUE DILIGENCE, UH, OF, UH, CONCEPTUAL SITE PLANNING AND DESIGN FOR PHASE ONE.

AND OF COURSE, IN, UH, 2003 AS INDICATED, UM, THE CITY COUNCIL SPEC, UH, AUTHORIZED THE USE OF THE LAND TO INCLUDE A FUTURE SPECIFICALLY.

ACTUALLY, NEXT SLIDE, PLEASE.

UM, WE'RE CELEBRATING, I MEAN, THIS, THIS IS, UH, THE RENEWAL THAT'S COMING TO THIS AREA.

WE HAVE TO GIVE A LOT.

WE HAVE TO ALLOW THE PARTICIPATION OF ROLAND G PARISH, WHICH IS THE PARKS, UH, NAMESAKE.

HE'S A LOCAL BUSINESSMAN, AND, UM, PROVIDED A GENEROUS DONATION OF A MILLION DOLLARS.

WE'VE, UH, COORDINATED EXTENSIVELY OVER THE PAST SEVEN YEARS, UH, INTERNALLY ON THIS PROJECT, THE PARKS DEPARTMENT IS THE LEAD, UH, DEPARTMENT FOR THIS PROJECT.

BUT AS YOU CAN SEE, UM, IT WAS DEFINITELY A COLLABORATIVE EFFORT.

IN ADDITION TO THE PARKS DEPARTMENT, THERE WERE NINE OTHER, UH, DEPARTMENTS THAT COULD PARTICIPATE IN, UH, THE RENEWAL OF THIS, THIS, UH, PLAN IN THIS PARK.

NEXT SLIDE, PLEASE.

SO, HERE WE ARE, 30 YEARS LATER.

UM, WE'RE ABOUT TO DELIVER THE RENEWAL FOR THIS AREA.

I LOVE TO KEEP SAYING THAT WORD BECAUSE IT'S, IT'S UPLIFTING AND I THINK WE, WE NEED SOME UPLIFTING THESE DAYS.

UM, YOU, UH, THERE WILL, IT WILL INCLUDE, UH, SITE PREPARATION INFRASTRUCTURE.

I'LL HIGHLIGHT SOME OF THE IMPROVEMENTS IN THE PARK AND SOME AMENITIES THAT ARE COMING TO IT TO INCLUDE AN ATHLETIC FIELD, UH, SPORTS FIELD LIGHTING WITH THAT FIELD, A LARGE PICNIC PAVILION.

UM, WE'RE, WE WERE ESPECIALLY, UM, UM, INTERESTED IN MAKING SURE THAT THE, THE SIDEWALKS METHOD T STANDARDS, UH, SAME SIDEWALKS ON THE PERIMETER WHERE THE SIDEWALKS, UH, UH, IMPROVEMENTS WILL TAKE PLACE, AS WELL AS, UH, APPROPRIATE PEDESTRIAN LIGHTING ALONG CEDAR CREST.

UM, AND KEYS, THERE'S THE FUNDING BREAKDOWN.

OF COURSE, TOTAL PROJECT COSTS OR CONSTRUCTION COSTS ARE A LITTLE OVER $8 MILLION.

UH, THAT INCLUDES, UH, MONIES FROM THE EQUITY FUND, OBVIOUSLY OUR INFRASTRUCTURE INVESTMENT FUND AND THAT GENEROUS DONATION FROM MR. PARISH.

THE CONSTRUCTION WILL BEGIN, UH, NEXT MONTH IN 2025.

AND IT'S SLATED TO BE COMPLETED, UH, IN DECEMBER.

OKAY.

AND AGAIN, THIS IS, UM, THAT WAS PHASE ONE IMPROVEMENTS.

SO WHAT WE ARE HERE TODAY, UH, ABOUT IS PHASE TWO AND THE REQUEST FOR DISTRICT TO DISTRICT FUNDING.

AGAIN, FOR THE CONCEPTUAL SITE PLAN, DEVELOPMENT AND PLANNING.

UM, THE CITY IS INTENDING TO INVEST ANOTHER $10 MILLION IN THE PROJECT, UH, IN, I'M SORRY, IN THE PARK, UM, WITH 2024 BOND FUNDS.

THE VISION FOR THIS NEXT PHASE IS AN ATHLETIC COMPLEX, UH, TO SERVE THE REGIONAL, THE REGION, UH, WITH REGIONAL, UH, REGIONAL TOURNAMENT FACILITY, AND TO DRAW ECONOMIC DEVELOPMENT OPPORTUNITIES.

UM, OBVIOUSLY, UH, HEALTH AND WELLNESS ARE THE PRIORITIES.

SO A SIGNATURE HEALTH AND UH, WELLNESS FACILITY TO COMPLIMENT THE ATHLETIC, UH, COMPLEX IS SIGNIFICANT.

EXTERNAL PARTNERS WILL BE SOUGHT FOR THIS NEXT PHASE.

AND AGAIN, I'LL GO BACK TO THE REQUEST THAT FOR TODAY'S REQUEST OF T FUNDING WOULD GO TOWARDS THE CONCEPTUAL SITE PLAN, DEVELOPMENT AND PLANNING FOR THE POTENTIAL

[00:10:01]

ATHLETIC COMPLEX AND THE HEALTH AND WELLNESS FACILITY.

THE SPECIFIC FUNDING REQUEST, AGAIN, IS $300,000.

FOR PHASE TWO.

UH, AGAIN, PARKS WOULD BE THE LEAD DEPARTMENT, UM, AND THEY WOULD SEEK A SUPPLEMENTAL AGREEMENT WITH THE FIRM THAT'S, UH, OVERSEEING DESIGN CONSTRUCTION ANYWAY, DOWN, AWAY AND ASSOCIATES.

NEXT SLIDE PLEASE.

A BREAKDOWN OF WHAT'S CURRENTLY, UH, IN THE CEDAR CREST SUB-DISTRICT.

THE AVAILABLE FUNDING, UM, ROUGHLY $650,000.

THAT'S UNENCUMBERED WITH THIS PENDING REQUEST, UH, MINUS 300,000.

THAT WOULD LEAVE ROUGHLY ALMOST 350,000 AS A REMAINING.

NEXT SLIDE, PLEASE.

OBVIOUSLY, THE RECOMMENDATION IS TO APPROVE AND FORWARD A RECOMMENDATION TO THE CITY COUNCIL FOR AN AMOUNT NOT TO EXCEED $3,000 FOR DESIGN CONSULTANT SERVICES, UH, FOR PHASE TWO OF ROLAND G PARISH PARK.

NEXT SLIDE PLEASE.

THE NEXT STEPS WOULD INCLUDE, UM, GOING TO THE PARK BOARD ON FEBRUARY 20TH, BRIEFING THE ECONOMIC DEVELOPMENT COMMITTEE ON MARCH 3RD, AND SEEKING CITY COUNCIL APPROVAL ON MARCH 26TH.

SO THAT CONCLUDES, UM, PRESENTATION.

MR. CHAIR.

THANK YOU.

AT THIS POINT, COMMENT AND MEETING THREE MINUTES PER, WE HAVEN'T REALLY HAD A FORMAL TIME COMMITMENT.

I THINK AS LONG AS THERE'S NOT A LONG WINDED THING THAT FROM BEING ABLE TO ASK THEIR QUESTIONS.

SURE.

THANK MICHAEL KING, PRESIDENT CITY.

ALSO, I'M VERY, BEEN 15 YEARS.

WE HAVEN'T SEEN NOTHING OUT.

GET THAT TRANSFER FARM FROM, FROM THIS TO A TIP SOMEWHERE.

I THINK INAPPROPRIATE, AND I'LL FOLLOW MY GRANDFATHER, THE STATE CONTROLLER'S OFFICE, THE STATE CONTROLLER O WE REPORTS TO ON ANNUAL BASIS, MR. DEPARTMENT, UH, CONVERSATION WITH THEM.

ALSO THE STATE REPRESENTATIVE TO GROVE AND STATE, CENTRAL ROSS WEST, THEY GONNA BE PART OF THIS BOARD AS WELL, BECAUSE THIS IS WITHIN THEIR DISTRICT.

I TALKED TO THE STATE REP.

SHE KNOW, SHE KNOW ANYTHING ABOUT, UH, I'M VERY CONCERNED ABOUT THEM THINGS WITH THEM.

I DON'T TAKE NO FARM, GO OUT THIS SHIFT OUTSIDE THE DISTRICT.

WE GOT THE GOLF COURSE WITHIN THIS DISTRICT.

WE GOT PARK ONE DEGREE PARK, ANOTHER PARK WITHIN THE ZONE, AND THE ONE DEGREE PROJECT 75 DISTRICT.

WE AIN'T SEE NOTHING HERE.

SO I GUESS MY QUESTION TO THE STAFF, THE CITY REACH OUT TO MR. COOPER, GONNA DO A PROJECT, I, YOU SEE 75 ACRES IN THIS DISTRICT NEED TO SEE.

SO, I MEAN, SEE SO HAPPEN IN THIS DISTRICT, CITY DISTRICT BEEN 15 YEARS, NOTHING HAPPENED.

SO I, I'M SUPPORT THIS, I I'M SUPPORT THIS, I WOULD BE ME WITH THE OTHER STATE LEVEL TO LOOK INTO THIS.

I DO HAVE POLICY CHAPTER THREE, LEVEL LOCAL CONTEXT, THE TAX FINANCING ACT.

AND, UH, I READ THROUGH CAREFULLY AND I THINK THERE IS VIOLATION GOING ON FOR THE CENTER.

IF THEY CAN'T, IF THEY, THEY DON'T HAVE TIME SERVE ON THEY, SO I THINK SOME NEED TO BE LOOKED AT VIOLATION CHAPTER THREE.

BUT THE, I LIVE IN THIS NEIGHBORHOOD, LIVE ON, I KNOW USED TO BE FORMER, THE NEIGHBORHOOD THAT SEE THE BALL YEARS AGO, BUT THEN TWO SIX 2006 BOND PROGRAM AND YOU HAVE ONE 2017.

SO I THINK WE NEED TO JUST PROBABLY PULL A HOLE KICKED OFF.

IT'S NOT MAKING SENSE TO HAVE A PHONE TRANSFER OUT OUR DISTRICT TO GO SOMEWHERE ELSE.

OUR DISTRICT HAPPENED 15 YEARS, AIN'T NOTHING 15 YEARS DEGREE PROJECT.

SOME GET MORE GONNA DO WITH THE PROJECT AND MOVE ON, OR IF HE NOT DOING THE PROJECT BUT DESIGNATE FOR THIS AREA.

SO WE NEED TO ACTUALLY NOT SUPPORT THIS AND GIVE FURTHER,

[00:15:01]

FURTHER FROM STATE LEVEL.

MR. AL STATE CONTROL OVERSEAS THIS, HE GETS Y'ALL REPORT EVERY, EVERY YEAR FROM THE DR TIER.

THEY HAVE THE IFF, THIS IS THE CEDAR FIRST SUBDISTRICT, WHICH INCLUDES, LIKE I SAID, THE SEA GULF COURSE, ANOTHER PARK LANE, UH, WITHIN THIS DISTRICT.

I PASSED THIS, I PASSED HIGHWAY TRYING THIS PASSED MY WAY DOWN HERE.

BUT THIS NOT OUT THERE NOW AROUND JUST, I KNOCK DOWN TREES DOWN.

THERE'S NOTHING, NOTHING.

THERE'S 3,000 EAST KEITH.

THAT DOESN'T MEAN THAT EXIST.

CALL THE D CENTRAL DISTRICT.

THERE'S 3,000 EAST.

I LIVE ON COUNTY TO GET INVOLVED AT THIS POINT.

ARE THEY NOT? OR DID HE GET MORE INFORMATION FROM STATE LEVEL? STATE? THE STATE REPRESENTATIVE DISTRICT.

THANK YOU, MR. JOE.

IS THERE ANY QUESTIONS FROM THE BOARD ABOUT THIS PROJECT AT THE MOMENT? YEAH, I HAVE ONE.

UM, DID, I'M JUST UNDERSTOOD, I WANNA MAKE SURE I'M CLEAR THAT GENTLEMAN, UH, SUPPORTS THIS.

CORRECT.

WHO SPOKE? I BELIEVE I HEARD AN OPPOSITION.

AN OPPOSITION.

YEAH.

HE HAS SOME CONCERNS.

I WILL, YOU KNOW, ADD MAYBE A LITTLE BIT OF BACKGROUND.

UM, THESE, FIND SOME OF THOSE.

SO FOR THOSE OF YOU THAT WEREN'T ON THIS BOARD, KIND OF WHEN IT WAS FIRST SET UP IN 20 2008, 2010, UM, WE EXPANDED THE TIP DISTRICT TO INCLUDE, WE CREATED A CEDAR CREST SUBDISTRICT IN 2010 AS AN EXPANSION BECAUSE WE ANTICIPATED THAT THERE WOULD BE A MASTER PLAN DEVELOPMENT CALLED WONDER VIEW.

UM, IT'S OWNED BY THE CUBAN COMPANIES.

UNFORTUNATELY, THAT PROJECT DID NOT GO FORWARD.

UM, AS RECENTLY AS A FEW MONTHS AGO, WE REACHED OUT TO, UH, MARK CUBAN'S OFFICE TO FIND OUT IF THEY HAVE ANY PLANS TO GO FORWARD.

WE WERE TOLD THAT THIS TIME THEY HAVE NO PLANS TO DEVELOP THE PROPERTY, IT'S PRIVATE PROPERTY.

SO WE HAVE NO WAY TO, TO FORCE THEM TO DO ANYTHING WITH THE PROPERTY.

BUT BECAUSE THAT DEVELOPMENT NEVER WENT FORWARD, THE CEDAR CREST SUBDISTRICT HASN'T REALLY SEEN ACTIVITY.

UM, SO THERE HASN'T BEEN DEVELOPMENT TO GENERATE A LOT OF REVENUE.

UM, SO THE REVENUE THAT HAS BEEN GENERATED IN THAT SUBDISTRICT HAS LARGELY JUST BEEN SOME PROPERTY APPRECIATION.

SO PART OF WHY WE BROUGHT THIS FORWARD IS IT WAS AN OPPORTUNITY TO DO SOMETHING POSITIVE IN THE AREA WITH THE LITTLE BIT OF FUNDING AVAILABLE.

UM, WE HAVE NOT, WE'VE HAD A NUMBER OF MEETINGS AND CONVERSATIONS WITH MR. KING OVER THE YEARS.

THERE HAS NOT BEEN ANY OTHER SPECIFIC PROJECTS IDENTIFIED THAT COULD BE, YOU KNOW, DEPLOYED WITH A SMALL AMOUNT OF FUNDING TO DATE.

UM, AND IN TERMS OF THE, THE COMMENTS ABOUT STATE REPRESENTATION, WE HAVE A, A CITY ATTORNEY ON THE LINE, BUT WE'VE SPOKEN WITH THEM AND THERE'S, THERE'S A COUPLE OF DIFFERENT PARTS TO STATE LAW.

UM, STATE REPRESENTATIVES ARE ONLY, UM, ONLY PARTICIPATE AS BOARD MEMBERS ON TIP DISTRICTS THAT WERE CREATED BY PROPERTY OWNER PETITION.

UM, THIS TOD TIP DIS WAS A CITY INITIATED TIP DISTRICT.

WE ONLY HAVE TWO TIP DISTRICTS THAT WERE CREATED BY PROPERTY OWNER PETITION.

THE VAST MAJORITY OF OUR TIP DISTRICTS WERE CITY INITIATED.

SO THE STATE REPRESENTATIVE SLOTS ARE NOT APPLICABLE, UM, TO THIS TIP DISTRICT.

WHAT, WHAT I, WHAT I'M UNCLEAR OF, 'CAUSE I I HAD A HARD TIME HEARING WAS WHY THE OPPOSITION GENERALLY.

AND, AND I, I DON'T, I I DIDN'T HEAR HIS, UH, SIR, YOUR NAME EITHER, SO I APOLOGIZE, BUT I, I DON'T UNDERSTAND THE, THE OPPOSITION.

SO COULD I GET A, A SUMMARY OF THAT AGAIN? 'CAUSE AGAIN, THE, THE AUDIO IS NOT GREAT FROM A YEAH, YOU MIGHT WANNA SPEAK LOUDER 'CAUSE OUR MICROPHONE, WE COULD I SPEAK, I HEARD TWO, TWO THINGS.

ONE IS THESE FUNDS ARE OUTSIDE OF THE BOUNDARIES OF THE TIF WAS ONE, AND THEN THE SECOND ONE, THE OTHER WAS THAT, UH, THIS WASN'T, THERE ARE NO OTHER PROJECTS AHEAD OF THIS THAT MAYBE HOLD HUNDRED PROJECT AHEAD OF THIS.

ALTHOUGH MY UNDERSTANDING IS THERE ARE NO OTHER PROJECTS.

YEAH, THERE HASN'T BEEN ANYTHING IDENTIFIED TO DATE THAT WE COULD DEPLOY WITH THE SMALL AMOUNT OF FUNDING THAT WE HAVE.

AND IT IS, UM, ALLOWED BY STATE LAW TO SPEND

[00:20:01]

FUNDS OUTSIDE OF THE TIP DISTRICT FOR CERTAIN PURPOSES, LIKE PLACES OF PUBLIC ASSEMBLY, LIKE A PARK OR ELIGIBLE USES.

THIS IS IN VERY CLOSE PROXIMITY TO THE, THE TIP BOUNDARY AS WELL.

YEAH, BETWEEN THE BOUNDARIES.

GOT THE DARK BUS BANK FACILITY.

YOU HAVE A, I GUESS METAL STUFF, RIGHT? KEYS INSIDE.

THEN YOU HAVE A DID MAINTENANCE, DI WAREHOUSES THERE.

COMMERCIAL PROPERTY BETWEEN THERE AND BETWEEN PROPERTY.

PROPERTY, YOU HAVE A MULTIFAMILY RIGHT THERE AT THE CORNER.

KEITH AND CEDAR CREST AND THE SERVICE BEFORE YOU GET THERE, IT, IT IS CONTROL CO CALL.

AND I, I MEAN I JUST, I THINK THE FUNDING STAY, THE DISTRICT GOT PUBLIC WORK USE IF THEY NEED TO, WE GOT STUFF DONE.

OKAY.

IF THAT'S THE CASE, WE HAVE RESIDENTIAL HOME THAT'S WITHIN THIS BOUNDARY AS WELL.

ON AND SOUTHERN.

WE, WE HAVE RESIDENTIAL HOMES AND THESE LOCATIONS ALREADY.

THANK.

ARE THERE ANY OTHER QUESTIONS WITH THE BOARD GUEST? TODD, I SEE YOU HAVE WINDOW UP.

YEAH, I WAS CURIOUS, DID THE PARK, UH, DEPARTMENT REACH OUT TO THE COMMUNITY IN THE AREA TO SOLICIT FEEDBACK AS TO WHAT THEY WANTED TO SEE IN THE PARK AS IT DEVELOPED? OR IS THAT IN A SUBSEQUENT PHASE? YEAH.

UH, DURING THE PHASE ONE DESIGN, THERE WERE TWO LARGE COMMUNITY MEETINGS HELD AT THE, UH, PEACE LIBRARY.

WE HAD, UH, THERE AND, UH, REPRESENTATIVES FROM VARIOUS, UH, PARTIES.

AND , YOUR MICROPHONE IS CUTTING OUT.

I DON'T KNOW IF YOU'RE SITTING TOO FAR AWAY FROM IT.

I CAN'T HEAR ANYBODY.

SUE, I CAN HEAR YOU GREAT, BUT THE REST OF THEM YEAH, YOU SPEAK LOUDER BECAUSE THERE'S, UM, YES, I AGREE.

IT IS KIND OF CUTTING OUT A LITTLE BIT.

UM, YEAH.

HI, UH, MY NAME'S STEFAN KESSLER.

I'M A DIVISION MANAGER FOR PARK AND REC OVER THE PLANNING AND DESIGN OF THE PHASE ONE PARK.

AND WE HAD TWO COMMUNITY MEETINGS, ONE TO SET THE SCOPE OF THE PARK, WHAT THE COMMUNITY WANTED TO SEE, AND THEN THERE WAS A SECOND MEETING TO SHOW AGAIN WHAT THEY WANTED IN, IN OUR CONCEPTS FROM THE CONSULTANT THAT SOLVED THAT PROGRAM TO SHOW, UH, AMENITIES THAT WERE ASKED FOR IN THE CONCEPT.

OKAY.

ALRIGHT.

GREAT.

THANK YOU.

ALL RIGHT.

I HAVE ANOTHER FOLLOW UP THEN.

UM, SO IF, IF THESE FUNDS AREN'T PROVIDED THROUGH THIS SUB-DISTRICT, UM, TO THE PARK BOARD, TO THE PARK, UH, STAFF MEMBER HERE, UH, SIR, I'M SORRY, I DIDN'T HEAR YOUR NAME.

UM, ARE, DO YOU HAVE ALLOCATED FUNDS FOR THIS DESIGN ELSEWHERE? FOR THE PHASE TWO? YEAH, WE DO HAVE, UH, 24 BOND FUNDING.

UH, AND THAT WAS, UH, 10 MILLION FOR THE ATHLETIC COMPLEX THAT'S PROPOSED.

UH, BUT AGAIN, DURING DESIGN, WE WILL REACH OUT TO THE COMMUNITY AND, YOU KNOW, SHOW WHAT THE PROPOSED DESIGN OR, OR, UH, UH, SERIES OF AMENITIES MIGHT BE AND, AND ASK FOR FEEDBACK.

I THINK WHAT HE, HE'S ASKING IS IF, IF THE BOARD DOESN'T APPROVE THIS FUNDING, DO YOU HAVE ANOTHER WAY TO FUND THE DESIGN FOR PHASE TWO? WE DO.

UH, BUT IT, IT IS NOT AVAILABLE RIGHT NOW.

IT DOESN'T GET FUNDED UNTIL OCTOBER.

WE COULD GET A HEAD START WITH THIS 300 TO DEVELOP THE SCOPE YEAH.

AND START THE COMMUNITY ENGAGEMENT, WHICH IS PRETTY TIME CONSUMING.

RIGHT.

AND SO IT'S ALREADY BEEN OUT THE BID FOR THE DESIGN AND, AND YOU'RE JUST WAITING FOR, UH, WHICH, WHICH COST CENTER YOU'RE GONNA PULL FROM? UH, NO, THERE HASN'T BEEN ANY DESIGN.

WE HAVE SOME SCOPING DOCUMENTS THAT SHOWS WHERE, YOU KNOW, ATHLETIC COMPLEX, HOW BIG IT MIGHT FIT, STUFF LIKE THAT.

IT'S NOT WHAT, WHAT WHAT I'M SAYING IS WHEN YOU, WHAT YOU'RE SAYING IS IF WE APPROVE TODAY, UM, YOU SAID YOU'LL GET THE A A HEAD START ON THAT.

DOES THAT MEAN THAT YOU'LL

[00:25:01]

PUT THIS OUT TO PROCUREMENT RIGHT, YOU KNOW, AS OF TOMORROW AND THEN DECIDE? NO, THEY, THEY, THEY WILL DO A SUPPLEMENTAL WITH THEIR EXISTING CONSULTANT.

OKAY.

OKAY.

THAT, THAT'S, THAT'S FAIR.

I GOT THAT.

OKAY.

UM, SORRY, I DON'T WANNA TAKE ANY OTHER BOARD MEMBERS' TIMES HERE.

UM, BUT I'LL, I'LL CONCEDE TO THEM.

TRAVIS, YOU HAD YOUR HAND UP.

THANK YOU.

I WAS WONDERING WHAT SPECIFIC TIMELINE AND DELIVERABLES ARE ASSOCIATED WITH THE $300,000 IN FUNDING? UH, YEAH, IF THE 300 GETS APPROVED, UH, WE'LL START ROUTING IN, UH, SUPPLEMENTAL AGREEMENT TO THE EXISTING DESIGN CONSULTANTS CONTRACT.

UH, THAT COULD BE A, UH, COUNCIL ITEM BY ITSELF.

AND TO AWARD THAT CONTRACT AMENDMENT USUALLY TAKES THREE MONTHS FROM WHEN THE FUNDING IS AVAILABLE.

UH, ACTUALLY CORRECTION, THE FUNDING HAS TO BE AVAILABLE WHEN THE COUNCIL APPROVES IT.

SO WE COULD START, UH, AHEAD OF, YOU KNOW, HAVE THE, UH, SUPPLEMENT READY AS SOON AS WE KNOW THAT THE FUNDS THAT WE HAD BE AVAILABLE.

WE'LL START WRAPPING IT FOR COUNCIL.

I THINK IT'S, I THINK THEY'RE, THEY'RE ASKING WHAT, WHAT THE MONEY WOULD PAY FOR IT'S CONCEPTUAL SITE PLANNING AND DEVELOPMENT.

RIGHT? IT IS, IT REALLY IS JUST A, A, UH, CONCEPT THAT WE COULD USE WHEN WE DO AN RFQ OR THE SECOND PHASE IS CONSULTANT.

SO IF WE STARTED AN RFQ IN THE SUMMER AND THE FUNDS ARE READY IN OCTOBER, WE COULD AWARD THE NEXT PHASES CONSULTANT TEAM AND HAVE A CONCEPT READY TO GO.

ONE OF THE QUESTIONS MAY BE, IF, IF THIS SUPPLEMENTAL GOES FORWARD, HOW LONG WILL IT TAKE FOR THEM TO DELIVER THE, THE SCOPE? UM, YEAH, THE ACTUAL, YOU KNOW, DESIGNING OR, OR CONCEPT DEVELOPMENT, UH, WILL TAKE A FEW WEEKS AND IT'S, IT'S ALL JUST A, A SITE PLAN.

THERE ARE NO DETAILS, IT'S JUST ALL CONCEPTUAL OF HOW THINGS ARE GONNA FIT ON SITE.

CRYSTAL , CRYSTAL, YOU'RE, YOU'RE ON MUTE.

CRYSTAL, YOU'RE NOT ON MUTE, BUT WE CAN'T HEAR YOU.

NO.

MAYBE MAY GO OFF AND COME BACK ON CRYSTAL.

YEAH, I THINK SHE HAS TO HAVE ON AUDIO.

OH, OKAY.

WE'LL GIVE HER A MINUTE TO SEE IF SHE CAN FIGURE IT OUT.

WE CAN'T HEAR YOU, CRYSTAL.

I'M SO SORRY.

BUT IF YOU WANT TO USE THE CHAT FEATURE, WE CAN READ IT OUT.

YEAH, I, I HAVE ANOTHER QUESTION.

SO IN THE FORESEEABLE FUTURE, THERE IS, THERE'S NO PROJECTS GOING ON IN CEDAR, CEDAR CREST SUBDISTRICT DISTRICT.

IS THAT WHAT I UNDERSTAND? YEAH, THAT'S CORRECT.

WE'VE HAD SOME CONVERSATIONS WHERE WE'VE ENCOURAGED, UM, MR. KING TO GET WITH HIS NEIGHBORS AND LET US KNOW IF THERE'S THINGS LIKE LIGHTING OR SIGNAGE THAT THEY MIGHT BE INTERESTED IN, BECAUSE THOSE ARE SORT OF SMALL ENOUGH PROJECTS THAT WE COULD GET MAYBE A CITY DEPARTMENT TO ENGAGE WITH THEM.

BUT NOTHING SPECIFIC'S BEEN IDENTIFIED TO DATE, UM, BASED ON OUR CONVERSATIONS.

AND UNFORTUNATELY THERE HASN'T BEEN A MAJOR DEVELOPMENT, SO THERE JUST HASN'T BEEN A LOT OF ACTIVITY.

OKAY.

UM, CRYSTAL, DID YOU GET YOUR AUDIO? OKAY, THERE SHE GO.

SHE GOT A QUESTION IN THE CHAT.

HAS ANY OTHER DESIGN FIRM BEEN ASKED FOR A PROPOSAL? UH, THE ANSWER IS NO.

WE CAN USE AN EXISTING CONSULTANT THAT KNOWS THE PHASE ONE PROPERTY ALREADY AND THE, YOU KNOW, UH, FLOOD ZONING AND DRAINAGE ON THE SITE IS ALREADY KNOWN TO THEM HOW, UH, THE EXISTING SITE THEY DO, THEY JUST HAVE SPECIAL KNOWLEDGE OF THE EXISTING SITE.

SO IT'S MORE ADVANTAGEOUS FOR US TO, UH, START THE CONCEPTUAL, UH, PHASE WITH THE EXISTING CONSULTANT.

HOWEVER, THERE WILL

[00:30:01]

BE A REQUEST FOR QUALIFICATIONS TO DO THE NEXT PHASE DESIGN.

WE'LL JUST HAVE A CONCEPT READY TO GO, UH, BEFORE THAT NEW CONSULTANT COMES ON BOARD.

I DO HAVE ONE QUICK QUESTION.

HOW MUCH TIME DOES THIS A YEAR THAT WE GAIN? SIX MONTHS.

IT BE SIX MONTHS.

YEAH.

WE'RE GETTING A SIX MONTHS AND START WITH THIS ONE.

YES.

SO WOULD YOU SAY THAT THIS CONTRACT WOULD GET THINGS TO A PRETTY GOOD CONCEPTUAL STAGE AND THEN AN RFP WOULD THEN DESIGN IT FOR LIKE CONSTRUCTION LEVEL DRAWINGS? THE RFQ WOULD BE FOR CO CONSULTANTS ONLY, NOT CONTRACTORS.

OKAY.

BUT WHAT IT, HAVING A CONCEPTUAL DESIGN, BEFORE YOU GO OUT FOR QUALIFICATIONS, YOU'RE ABLE TO TARGET MORE PRECISELY WHICH KIND OF CONSULTANT YOU'RE GETTING.

AND WHEN CONSULTANTS PROVIDE THEIR QUALIFICATIONS, THEY GEAR IT TOWARDS THE CONCEPT AND THEN GIVE YOU MORE.

WE CAN, WE CAN JUDGE THEM BY THEIR FIND KNOWLEDGE FOR THE, FOR THE SIDE TYPE OF CONSTRUCTION, THE TYPE OF PARK.

I HAVE A QUESTION.

I'M NOT SURE IF THIS IS GONNA BE ANSWERED.

UM, BUT LET'S SAY THAT THE PARK IS BUILT, UM, WHERE DOES THAT GET US ON THE, ON THE PARK SCORE FOR THIS PARK FOR OR FUTURE PARK OR A BALLPARK? I CAN'T ANSWER THAT RIGHT NOW.

I CAN, UH, GO TO OUR PLANNERS AND, AND FIND THAT.

OKAY.

I MEAN, WHAT, WHAT, IS THERE A, IS THERE A PARK WITHIN A 10 MINUTE WALK OF, OF THIS, UM, SUBDISTRICT OR LET'S SAY THE SURROUNDING NEIGHBORHOOD? WHAT'S THE CLOSEST PARK? I, I, I, I'M NOT ZOOMING OUT, SO IT'S HARD TO TELL.

THE ONLY EXISTING PARK, LIKE IN THE CADILLAC HEIGHTS NEIGHBORHOOD IS CADILLAC HEIGHTS PARK, AND THAT'S ON MORRELL.

OKAY.

IT'S LESS, LESS THAN AN ACRE.

UM, BUT THE COMPLEX THAT WE'RE TRYING TO BUILD IS NOT JUST A NEIGHBORHOOD PARK.

RIGHT, RIGHT.

UM, ANOTHER QUESTION I HAVE, I MEAN, THIS IS A TO OD TIFF, RIGHT? SO, YOU KNOW, I, I KNOW DART HAS A COUPLE, UH, BUS LINES COMING THROUGH THIS AREA.

UM, THERE'S ALSO A CONNECTION POTENTIALLY OUT TO THE, UH, TRINITY, UM, UM, UH, RIVER, THE BIKE TRAILS IS PRETTY CLOSE.

UM, MY, I GUESS MY, MY FEELING HERE IS THAT THERE'S, THERE'S FUNDING HERE TO GET THIS PARK GOING, BUT THERE'S ALSO, UM, MONEY THAT'S GONNA BE TAKEN AWAY FROM THE SUBDISTRICT AND, AND MAY NOT BE REPLACED ANYTIME SOON.

SO THAT'S MY DILEMMA RIGHT NOW IS, IS KNOWING THAT THIS PARK COULD STILL BE, IS MOST LIKELY STILL GONNA BE BUILT, BUT JUST DELAYED ANOTHER SIX MONTHS, IS, IS WHAT I AM GRAPPLING AT HERE.

SO I DON'T REALLY HAVE A QUESTION.

IT'S MORE OF A STATEMENT TO THE REST OF THE BOARD.

UM, AND I WANNA RESPECT THE ONE, UH, ON NEIGHBOR WHO DID SHOW UP, UM, IN OPPOSITION TO THIS, UH, REQUEST.

UM, SO I JUST WANTED TO STATE THAT.

THANK YOU.

CAN I REAL QUICK JUST SUMMARIZE IN MY HEAD WHAT'S, WHAT MAYBE JONATHAN'S DILEMMA IS, IS, SO THERE'S ROUGHLY $650,000 THAT'S BEEN SITTING IN THIS, UH, ECONOMIC DEVELOPMENT BUCKET FOR THE LAST 15 YEARS.

AND THIS IS THE FIRST PROJECT IN 15 YEARS THAT'S BEEN PRESENTED THAT WILL ACTUALLY, UH, INSPIRE SOME ECONOMIC DEVELOPMENT.

AND IF IT DOES NOT GO THROUGH, THEN THERE'S NOTHING IN THE NEAR FUTURE TO TAKE UP THAT, UM, TAKE UP THE PLACE OF THIS PARK.

AND THIS IS MORE THAN JUST TREES AND GRASS AND A SWING SET THAT THERE IS GOING TO BE A SPORTS COMPLEX.

AND I THINK, DID I SEE THAT THERE WAS GONNA BE A SENIOR COMMUNITY CENTER OR A COMMUNITY CENTER AS WELL? I THINK THAT'S PART OF THE MISSION.

NOT, NOT, IT'S NOT PART OF PHASE TWO.

IT, IT WOULD BE A FUTURE BOND PROGRAM TO, TO DO THE BUILDING.

OKAY.

SO IS THAT CORRECT? SO FAR AS TO WHAT I JUST SAID? WELL, TODD, IF I MAY, MY UNDERSTANDING IS THE PARK'S GONNA BE BUILT REGARDLESS.

THEY'RE JUST TRYING TO GET A HEADSTART ON TA IN TAKING SOME

[00:35:01]

OF THIS MONEY OUT OF THE, OF THE, OF THE CEDAR CREST SUBDISTRICT TIFF.

AND THAT'S MY DILEMMA, RIGHT? AS I, I TOTALLY, I'M ON BOARD WITH WHAT YOU'RE SAYING.

UH, IT'S A CATALYTIC, YOU KNOW, TYPE OF, OF PROJECT.

BUT AT THE EXPENSE OF REDUCING THIS TIP DOWN TO 300,000 FROM 600,000, IT, WHERE THAT, THAT, AGAIN, THE PARK IS GONNA BE BUILT, WHICH COULD CER, WHICH WILL CERTAINLY HELP TO, UM, SPUR ECONOMIC DEVELOPMENT.

BUT THEN, THEN MAYBE THERE'S A PROJECT THAT COMES LATER ON AND NEEDS THAT 600,000, BUT THAT, THAT $650,000 DOES NO GOOD SITTING IN AN ACCOUNT FOR 15 YEARS.

NO, BUT, BUT AM I, AM I CORRECT IN SAYING THAT? EXCUSE, EXCUSE ME.

AM I CORRECT IN SAYING THAT? EXCUSE ME.

I'M TALKING JONATHAN.

JONATHAN, I'M TALKING, JUST HOLD ON IF I'M, I, AM I CORRECT? YOU TALK A LOT, JONATHAN.

IT'S MY TURN.

SO NOTHING KILLS A NEIGHBORHOOD WORSE THAN VACANT LAND AND EMPTY BUILDINGS.

SO TO ME, I THINK THIS IS A GREAT USE OF $300,000 IS TO GET THAT NEIGHBORHOOD JUMP STARTED WITH SOMETHING THAT IS GO, POSSIBLY GOING TO SPUR PRIVATE INVESTMENT IN AND AROUND THE NEIGHBORHOOD.

I WILL SAY FOR THE BOARD'S BENEFIT, WE'LL CONTINUE TO COLLECT FUNDING IN THE SUBDISTRICT EVERY YEAR.

IT MAY NOT BE A WHOLE LOT BECAUSE THERE'S NOT BEEN DEVELOPMENT, BUT THERE WILL STILL BE A TRIPLE OF FUNDING, YOU KNOW, IN THE COMING YEARS.

UM, JUST DEPENDING ON WHETHER THERE'S ANY DEVELOPMENT IN THE FUTURE.

ALLISON, IF YOU WISH TO SPEAK, YES.

I'M SORRY, MY CAMERA FROZE, BUT I THINK I'LL HAVE TO REBOOT MY COMPUTER IF TO, TO MAKE THAT WORK.

BUT, UM, I THINK, SUE, YOU JUST TOUCHED ON WHAT I WAS ACTUALLY GOING TO POINT OUT IS THAT, UM, YOU KNOW, THESE INVESTMENTS, 300,000, UH, IS, IT'S, IT'S NOT AN INSIGNIFICANT AMOUNT, BUT GOOD AFTERNOON.

THIS IS LISA WITH THE DALLAS CITY ATTORNEY'S OFFICE.

IN ORDER TO SPEAK, UM, YOU'LL NEED TO TURN ON YOUR CAMERA, THEN I WILL HAVE TO LEAVE THE MEETING.

REBOOT, RE-LOG IN.

OKAY.

YOU VERY LITTLE.

OKAY.

THANK YOU.

THANK YOU.

THANK YOU, LISA.

OKAY, WE HAVE TIME FOR A FEW MORE COMMENTS.

UH, JONATHAN, YOU HAD A QUICK COMMENT.

YES.

IS IT TRUE THAT THE, THE PART WILL STILL GET HIS FUNDING FROM THAT BOND? IT JUST WON'T HAPPEN RIGHT NOW IF THE, IF THE, UH, IF THE BOARD DOES NOT APPROVE THIS FUNDS AND THE PARK IS STILL GONNA BE BUILT, IS THAT TRUE? I WANNA EXPLAIN THE DIFFERENT STAGES OF THE PR, LIKE WHAT IS ALREADY FUNDED VERSUS WHAT YEAH.

NOT GET.

UM, I, I THINK I MIGHT BE SPEAKING ON A TURN FOR, YOU KNOW, KNOWING WHEN THE FUNDS ARE AVAILABLE AT THE EARLIEST THEY'D BE AVAILABLE IN OCTOBER FOR DESIGN, AND THEN THE FOLLOWING YEAR THERE WOULD BE ADDITIONAL FUNDS FOR THE CONSTRUCTION.

AND THESE GET RELEASED IN OCTOBER, BUT I HAVE TO GO CONFIRM THAT THE FIRST, UH, FUNDING COMES THIS OCTOBER.

THAT'S THE EARLIEST.

IT'S THE EARLIEST.

SO IT'S, IT COULD BE SAVING US MORE THAN SIX MONTHS IF THE FUNDS DON'T COME THIS OCTOBER.

OKAY.

MINIMUM OF SIX MONTHS SAY CORRECT.

BUT REALISTICALLY YOU CAN, YOU MIGHT ALSO WANNA CLARIFY THAT THIS WOULD BE DESIGNING A SPECIFIC COMPONENT THAT'S NOT ALREADY FUNDED, RIGHT? RIGHT.

DESIGN A SPECIFIC COMPONENT OF THE PART OF THE FACILITY.

RIGHT.

IT WOULD BE TO DO A CONCEPTUAL LEVEL SITE PLAN FOR THE PHASE TWO AREA.

AND WHAT WE CALL PHASE TWO IS FOUND BY BIRDSONG PACKARD BUICK MORELL.

AND YEAH, THAT'S PACKARD, BUT IT'S EVERYTHING, UH, EAST OF PACKARD AND NORTH OF BIRDSONG IS OUR PHASE TWO.

AND WE COULD BE, UH, FAR DOWN THE ROAD WITH OUR CONCEPT, OUR SITE PLAN.

WE'RE MEETING TO ORDER ON JANUARY 28TH, 2025 AT 2:03 PM AND I'LL TURN THE MEETING OVER TO OUR, UM, ACTING CHAIR.

UM, LUIS TE MAYO.

GOOD AFTERNOON EVERYONE.

WE HAVE FORUM.

SO LET'S GET STARTED WITH AGENDA ITEM ONE.

UM, BEFORE WE DO REMIND EVERYONE JOINING REMOTELY, UH, THAT WE ARE REQUIRED BY THE LAW THAT YOU HAVE YOUR CAMERAS ON, AND YOUR FACE IS

[00:40:01]

ON CAMERA FOR THE ENTIRE MEETING.

AND PLEASE MAKE SURE YOU'RE ON MUTE, OF COURSE, UNLESS YOU'RE SPEAKING.

UM, WITH THAT, I'D LIKE TO CALL THE TRANSIT ORIENTED DISTRICT BOARD DIRECTORS MEETING TO ORDER ON TODAY, TUESDAY, JANUARY 28TH.

AND, UH, TIME IS 2 0 4.

UM, ITEM NUMBER ONE, UH, WE CALL ORDER ITEM NUMBER TWO.

UH, IT IS THE INTRODUCTION OF PARTICIPANTS.

UH, WE'LL START KEVIN, RACHEL, COMMENT.

UH, OTHER PARTICIPANTS, WE, UM, I THINK TYPICALLY WE WAIT FOR THE PRESENTATIONS AND I DO PUBLIC COMMENTS.

THAT'S KIND OF THE CHAIR.

WE'LL, WE'LL, I SEE THAT WE HAVE PUBLIC COMMENTS THERE.

IT MAY HAVE TO BE ABLE HAVE A PRESENTATION, COMMENT ON SOMETHING THAT'S OKAY.

YEAH, IT'S REALLY UP TO THE CHAIR AND WE TYPICALLY LIKE TO DO THE PRESENTATION, BUT IN THE PUBLIC COMMENTS, I THINK WE'LL DO JUST AFTER THE PRESENTATION SO WE CAN REACT TO SOMETHING.

UM, OTHER MEMBERS, I, I GUESS EVERYONE ELSE IS ONLINE.

YES, SUE CAN, YEAH, EVERYONE ELSE IS ONLINE.

WE DO HAVE SOME STAFF.

UH, WE ALSO HAVE, UH, THE CITY ATTORNEY'S OFFICE ONLINE IF THERE'S ANY QUESTIONS THAT COME UP TO, AND WE HAVE, UM, STEFAN, WE HAVE SOME DEPART DEPARTMENT AS WELL AS JUST STAFF FROM OUR OFFICE.

OKAY.

OUR OTHER MEMBERS INTRODUCE THEMSELVES THAT ARE ONLINE.

HI, GOOD AFTERNOON.

THIS IS TRAVIS GASPER.

TRAVIS, GOOD AFTERNOON.

AUSTIN GREEN IS ON AS WELL.

SO I SEE WE HAVE, UM, TODD EDGE, JONATHAN BRADDOCK, CRYSTAL GONZALEZ, ALISON GRIFFIN.

I THINK THAT'S ALL THE MEMBERS ONLINE.

THANK YOU.

NEXT TIME IS REVIEW AND CONSIDERATION RECORD OF THE DECEMBER, DECEMBER 3RD, 2024 TOD TWO BOARD DISTRICT MEETING.

UM, THAT WAS STAFF RECOMMENDATION OF APPROVAL.

IF EVERYONE HAS HAD A CHANCE TO REVIEW THE MINUTES, I WILL TAKE A MOTION, A MOTION.

THE MINUTES BE APPROVED AS STATED.

I SECOND THAT A MOTION, SECOND HEARING, UM, MOTION AND A SECOND.

UH, WILL ALL ALL THOSE IN FAVOR SAY RAISE THEIR HAND AND SAY AYE? AYE.

AYE.

ANYONE OPPOSED? MOTION CARRIES UNANIMOUSLY.

UM, ITEM FOUR IN IS REVIEW IN CONSIDERATION OF ONE REQUEST BY THE CITY DEPARTMENT AND RECREATION DEPARTMENT FOR AN AMOUNT NOT TO EXCEED $300,000 IN TOD TIF DISTRICT FUNDING FOR DESIGN CONS, UH, CONSULTANT, CONSULTANT SERVICES, INCLUDING BUT NOT LIMITED TO CONCEPTUAL SITE PLAN DEVELOPMENT AND PLANNING FOR FUTURE PHASE TWO IMPROVEMENTS WITHIN RONALD G PARISH PARK ADDRESS AT 3,800 EAST BOULEVARD.

AND TWO, A FINDING THAT DEDICATING AN AMOUNT NOT TO EXCEED $300,000 IN TIF IN TOD TIF DISTRICT FUNDING TO RONALD G PARISH PARK, A PLACE OF PUBLIC ASSEMBLY THAT HAD LOCATED APPROXIMATELY 800 FEET, 0.15 MILES OUTSIDE OF THE CEDAR CREST SUBDISTRICT OF THE TOD TIFF DISTRICT, BUT WILL SERVE THE CEDAR CREST SUBDISTRICT OF THE T-O-D-T-O-D TIFF DISTRICT IS A BENEFIT TO THE CEDAR CREST SUBDISTRICT OF THE TOD TIFF DISTRICT AND IS NECESSARY AND CONVENIENT TO THE IMPLEMENTATION OF THET OD TIF DISTRICT PROJECT, LAND AND REINVESTMENT ZONE FINANCING PLAN.

WE HAVE PRESENTER, ANGELA, UH, THE DISTRICT MANAGER ELSE ECONOMIC DEVELOPMENT, AND WE GO, HOPEFULLY EVERYONE CAN SEE THE PRESENTATION ON THE SCREEN.

YEP.

GOOD AFTERNOON, EVERYONE.

UH, JUST ONE LITTLE ONE OF CLARIFICATION.

ROLAND G PARISH.

NO, THAT'S OKAY.

RO THE G SORRY.

WE HAVE GO AND I WILL UNDERSCORE THAT THIS IS, UH, FOR PHASE TWO, THE CONCEPTUAL SITE PLAN DEVELOPMENT AND PLANNING, UH, FOR RG PARISH PARK, UM, WHICH WAS, UH, ONIC.

NEXT SLIDE, PLEASE.

OKAY.

SO WE'RE TALKING ABOUT THE FORMER CADILLAC HEIGHTS PARK NEIGHBORHOOD.

UH, MUCH DISCUSSED, UM, ABOUT THIS, UH, NEIGHBORHOOD.

UH, IT'S A NEW PARK, UH, ADDRESSED AT 3,800 EAST KEYS BOULEVARD.

UM, APPROXIMATELY 25 ACRES

[00:45:01]

OF LAND.

AND, UM, ABOUT 800 FEET, AS WOULD BE INDICATED EARLIER, OUTSIDE THE CEDAR CREST SUBDISTRICT OF THE TLD TIFF DISTRICT.

UM, A PART OF THE HISTORY OF THE PARK, IT HAS BEEN NO, UH, SECRET THAT THERE HAD BEEN A LACK OF FLOOD PROTECTION, A LACK OF ENVIRONMENTAL PROTECTION, AND A LACK OF INVESTMENT.

AND WE'RE HAPPY TO START CORRECTING THAT AND BRING RENEWAL TO THIS PARK.

UM, JUST BRIEFLY, UM, BETWEEN OH THREE 2003 AND, UH, 2006, THERE WAS A GENERAL OBLIGATION OF BOND FUNDING TO ACQUIRE THE LAND.

AT THE TIME, THERE WAS DISCUSSIONS ABOUT IF IT WOULD BE SUITABLE FOR, UH, A FUTURE POLICE ACADEMY OR RELATED FACILITIES, AND LATER DETERMINED THAT IT WAS NOT SUITABLE FOR THAT, BUT POTENTIALLY SUITABLE FOR A FUTURE PARK.

THE, UH, PARK AND RECREATION DEPARTMENT ENGAGED BETWEEN 2021 AND 2023 IN THE PROFESSIONAL SERVICES AND DUE DILIGENCE, UH, OF, UH, CONCEPTUAL SITE PLANNING AND DESIGN FOR PHASE ONE.

AND OF COURSE, IN, UH, 2003 AS INDICATED, UM, THE CITY COUNCIL SPEC, UH, AUTHORIZED THE USE OF THE LAND TO INCLUDE A FUTURE SPECIFICALLY.

ACTUALLY, NEXT SLIDE, PLEASE.

UM, WE'RE CELEBRATING, I MEAN, THIS, THIS IS, UH, THE RENEWAL THAT'S COMING TO THIS AREA.

WE HAVE TO GIVE A LOT.

WE HAVE TO ALLOW THE PARTICIPATION OF ROLAND G PARISH, WHICH IS THE PARK'S, UH, NAMESAKE.

HE'S A LOCAL BUSINESSMAN, AND, UM, PROVIDED A GENEROUS DONATION OF A MILLION DOLLARS.

WE'VE, UH, COORDINATED EXTENSIVELY OVER THE PAST SEVEN YEARS.

UH, INTERNALLY ON THIS PROJECT, THE PARKS DEPARTMENT IS THE LEAD, UH, DEPARTMENT FOR THIS PROJECT.

BUT AS YOU CAN SEE, UM, IT.